Delivery & Terms

From Order To Installed Surface

The six steps your project actually follows after you contact the factory — with no trading intermediary in between. What happens at each stage, who handles it, and what we commit to in writing.

Loading Port
Qingdao
Trade Terms
FOB Qingdao · CIF
First Response
24h
Office Hours
Mon–Sat, 8:00–18:00 (GMT+8)

The Six Commercial Steps

  1. 01

    Inquiry & Requirement

    Send your venue size, target federation standard and timeline. Our engineering team picks it up from there.

    24hFirst Response
  2. 02

    Proposal & Quotation

    A factory-direct quotation with a layout proposal — 3D spatial CAD arena planning where the project needs it.

    3D CADArena Layout
  3. 03

    Sample Verification

    Sample support before you commit. Samples ship with material specifications so your team can verify quality first.

    SamplesBefore Bulk Order
  4. 04

    Order & Production

    Production runs against the confirmed specification: calibrated polymer density and automated CNC cutting on our own lines.

    50+Automated Units
  5. 05

    Quality Audit & COA

    In-house laboratory testing for density, impact absorption and safety. Every container leaves with its batch Certificate of Analysis.

    COAPer Container
  6. 06

    Logistics & Installation

    Export packing and loading plans from Qingdao, plus technical guidance for on-site assembly.

    FOB / CIFQingdao
Before It Ships

Four Gates Every Batch Passes

  1. Gate 01
    raw material inspection
  2. Gate 02
    in-line thickness and density monitoring
  3. Gate 03
    in-house laboratory testing
  4. Gate 04
    pre-shipment inspection with quality report

The engineering side of steps 04–05 — foaming, CNC cutting and laboratory testing — is documented step by step on . Certification scope for each federation is on .